How Long Does it Take to Build a House in Toronto2023-08-10T15:58:08-04:00

Time to Build House in Toronto

Free Architectural Drawings
when
Building with ALBO HOMES

Offer Valid Until April 30, 2024

Request a Consultation

Name(Required)

How Long Does it Take to Build a House in Toronto

Overall time to build custom home in Toronto is 10 month.  Other factors will affect overall timing. Preparation for house construction needs to be completed by without mistakes.  Permits and drawings are provided by design and build company. With experienced builder like ALBO Homes your home may be completed just over 1 year.

Of course there are many different situations and types of the houses that can either increase time or simplify construction process. Many delays can be caused by material suppliers or by decision making for design or specific material selection. ALBO Homes team wanted to break down the process and explain how long does it take to build a house.

Chart of How Long it Takes to Build a House

Every project is estimated separately for cost and time for completion. After all it is a construction process that involves parties from builder’s side, client, city officials, suppliers and designers. Our job as the builder is to manage the flow of construction without compromising quality or budget.
Simple/Small Average Complex/Large
Design Stage 3 Month 4 Month 6 Month
Permits 1 Month 2 Month 4 Month
Preparation 1 Week 2 Weeks 4 Weeks
Exterior Construction 3 Month 4 Month 5 Month
Interior Finishes 3 Month 4 Month 6 Month
Touch Ups and Fixes 1 Weeks 2 Weeks 3 Weeks
Landscaping 2 Weeks 3 Weeks 5 Weeks

Types and Sizes

Time for Documents and Permits

Morbi lobortis netus ac eget at montes.

City Permits and Reports for Building Home

In Toronto before building a house, home owner or builder need to submit package of documents for city review. Inspectors compare proposed house for construction with current by law and limitations. Different services will be contacted prior to work by home builder company. This will depend on area for construction and other factors. Good example of documents and reports submitted for permits are environmental report, arborist report, all architectural drawings with elevation and survey.

No one can say exactly how long does it take to build a house in Toronto because permitting stage depends directly on city officials and architect. This is the last step before finally starting physical work. With permits and final drawings your design and build company should have all details to follow in construction. Experienced home builders like ALBO will save you time and complete reports parallel to with designing you home with drafting plans. This will save at least few months of work and preparation.

Typical timeframe for completing city permits with all necessary reports for house construction in Toronto can take up to 3-5 month on average size house.

Free Architectural Drawings
when
Building with ALBO HOMES

Offer Valid Until – April 30, 2024*

From breaking ground to move in

Morbi lobortis netus ac eget at montes.

Construction of New House in Toronto

Demolition and excavation is a big part of house construction and is very often not taken into consideration by home owners. Same as other steps our time process will be based on average size and complexity of house. Well prepared and experienced home builders will schedule trades ahead of time and have all purchases lined up for when they need them on site. The similar process is done with finishing materials like tiles, showerheads, door and many more. To save time in the process the materials have to be selected in design stage or in early construction. Constant supervising will help to stay on track and avoid mistakes that have to be corrected later on. Time to build custom home in Toronto is provided in proposal by ALBO Homes builders.

Construction work is always weather dependant, but experienced home builders like ALBO Homes should finish your new home within 8-11 month.

Render living space and exterior

Morbi lobortis netus ac eget at montes.

Designs and Drawings for New House

The fastest way home owners may complete entire set of drawings with designs is by providing examples of houses similar to what they expect to achieve as the end result. If you are unsure of what type of house you want to construct and your architect is not very experienced, the total time will increase on completing the drawings. The other factor in time to build custom home Toronto is revisions on design proposal. This could be due to poor initial design or home owner constantly changing their mind of what they want. With complexity and increased size of house time to complete drawings will be longer.

Based on average house complexity and size of 3000 square feet the time with architects and designers for drawings on your new house should take 2-3 month.

New Build

Size 2500 sq ft 3300 sq ft
Average Land Cost $1 145,000 $1 412,000
Carrying Costs $50,000 $50,000
Construction Costs $970,000 $1 285,000
Total Investment $2 165,000 $2 747,000
New Market Value $2 650,000 $3 450,000
ROI 22.40% 25.59%

 

Addition & Renovation

Size 2500 sq ft 3300 sq ft
Average Land Cost $1 145,000 $1 412,000
Carrying Costs $50,000 $50,000
Construction Costs $863,300 $1 087,600
Total Investment $2 058,300 $2 549,600
New Market Value $2 410,300 $3 050,000
ROI 17.09% 19.63%

 

Selecting Local Home Builders

Once decision is mad on new home construction, you will need to find perfect candidates to perform the job. Most of home owners intend to view local builders that completed construction of home within their area and have experience in similar types of custom homes that they prefer for themselves. The other obvious factor is availability of design and build companies and if they can take on your project within preferred timelines.

The first question home owners will ask is how much certain builder company will charge for this type of project. Budget is very important factor for building custom home in Toronto, but developing trust with your builder and having them understand your vision of the finished home is far more important.

On average it takes 3 month to interview local builders, contact their referrals or visit their current projects and sign a contract for new custom house in Toronto.

Mental and Physical Preparation

Home owners that have ideas of building new home in Toronto will spend long time discussing this with significant others. Once it is clear that construction is the preferred option, the research for information starts from online resources and local companies that can help. Home owners will always prepare carefully before making final decision of building versus buying new house on MLS. Basic information people want to know is time to build custom home in Toronto as well as all associated costs with new construction. It is a long process and requires tons of money before you can move into your new constructed home. For this reason preparation stage is the most crucial in decision making for home owners in Toronto.

Some people are very motivated and decide on new build within few month and other home owners take years to digest all ideas with budgeting and other details.

OUR WORK FROM CLIENTS’ VIEW

FAQs

Can you also build garages?2023-08-10T15:56:05-04:00

We’ll build your project with everything you require. Do you need a garage? One car? More vehicles? No problem. We’ll also design other structures around the home, such as sheds or perhaps a small guesthouse or a summer kitchen.

We’ll provide landscaping services to ensure everything matches as well, so nothing looks out of order. No matter what extra structures you require around the home, we can get those done as well.

Do I have to find other professionals in the process?2023-08-10T15:55:26-04:00

No, you don’t. Here at ALBO Homes, we provide a full service. We’ll take care of every single aspect related to your build. We have consultants to understand your needs and help you figure out what you truly need, but we also have experienced architects to provide drawings, including 3D rendered sketches.

At the same time, our team also includes developers and builders. We’ll get the required permits for you, not to mention sourcing materials based on your requirements and budget.

How should I prepare for the first consultations?2023-08-10T15:54:32-04:00

During our first consultations, we’ll try to find out as much as possible about your project, the size of your family, personal needs and design preferences. We recommend thinking about everything you may want for your new home, and we’ll discuss each aspect separately.

To make it even easier, we often ask our clients to bring pictures of houses they like, whether they take these pictures themselves or they search over the Internet. That will give us a pretty accurate idea.

What does it mean to get a building permit?2023-08-10T15:53:14-04:00

The city council requires documents from the new homeowner or builder before the construction actually begins. These documents must be reviewed by officials in order to determine whether or not they match the current laws and regulations, as well as potential limitations.

Depending on how complex the project is, it may take weeks or months to obtain such a permit. Our architects ensure your project will match the current laws, but they’re also ready to make adjustments should unexpected situations arise.

How long does it take to build a house from scratch in Toronto?2023-08-10T15:52:34-04:00

Based on the complexity of your project, building a custom home in Toronto from scratch would take about 10 months. Of course, a massive multistory home would take slightly more than that, while a single bedroom bungalow would take less.

There are more considerations to discuss about, hence the necessity of a few consultations to fully understand your necessities and preferences. Furthermore, permits may also add to the time frame, but then again, it depends on how big your project is.

Go to Top